Slocum of Public Citizen: Behind the Blackouts
July 29th, 2006
.

Tyson Slocum has got it right, for the most part, but I wish every time someone mentions blackouts they’d also note the loading of the lines just before the blackout — that the lines are overloaded!
Pattern: Overloaded lines at off-peak times, overloaded with bulk power transfers. Operators are working hard to get those transfers through and don’t heed warning signs, don’t follow NERC protocol — they put private profit above public service.
In the Arrowhead transmission proceeding, I entered post-blackout studies, and in cases since. In the June 25, 1998 blackout study by MAPP, it notes that the system operator was focused on playing with the phase-angle rather than cutting loading, running at 1,004MW on a line with a stability limit of 700MW. Well, DUH, running the line 30% over limits, and then ignoring requests to decrease loading, is it any wonder?
A similar scenario occurred in June 10-11, 1997, when the lines were overloaded for MAPP exports, everything crashed. As the industry report notes:
This event should not be filed away as just another close call. We need to recognize just how close we were to collapsing portions of the Eastern Interconnection and adjust operating guides and reporting practices to avoid reoccurrence. There are real limits to the transfer capability out of the MAPP region and those limits are interedependent. This event is an alarming representation of how the MAPP regional interconnected system is being operated at or even beyond its capabilities.
Nebraska Public Power District, report on June 10-11, 1997 Disturbance (emphasis added).
Why is the grid “being operated at or even beond its capabilities” by system operators? Because they’re trying to make all the unregulated bulk power transfers they can — for profit. And they’re putting the system at risk, they’re putting us at risk.
The lie of the need for transmission goes back to these reports — transmission cases have been based on fearmongering, that we’re going to freeze in the dark in an incubator without a job if we don’t have these lines. The mantra of the Arrowhead case was “Where were you the night of June 25, 1998?” But we know better. We know we’re not at risk because we can’t get electricity we need, we’re at risk because they’re putting profits ahead of grid stability. We know the lines are for even more bulk power transfer. They’re trotting out these blackouts as reasons for more transmission when it’s their greed that is crashing the system.
Check out reports about blackouts! Look for statements about overloads, about operating beyond limits. Now and then, it’s caused by an unfortunate fried squirrel, but the majority of blackouts are caused by system overload instability. How dare they manipulate the grid that way… how dare they manipulate us that way! And put us at risk! But hey, who’s going to read utility blackout reports for the truth. So read! It’s not rocket science, it’s tinker toys, and the juicy parts are narratives in English that even an attorney can understand.
============================
From Common Dreams:
Published Friday, July 28, 2006
by Tyson Slocum
Ken Lay may have passed away and Jeff Skilling and other former executives face dozens of years behind bars, but Enronâ??s legacyâ??single-handedly pushing electric power deregulation at the federal and state levelsâ??unfortunately remains the law of the land. The radical restructuring that Enron achieved a decade ago overturned a century of orderly, accountable electricity planning that had made Americaâ??s power system the envy of the world. But our deregulated system is now a mockery, and consumers are left with higher prices and poorer reliability. Thatâ??s why our electric gridâ??from the August 2003 blackout that cascaded across the Midwest and Northeast, to recent power outages in New York and Californiaâ??is more susceptible to failures that trigger blackouts.
Before the implementation of Enronâ??s agenda, electric utilities were fully regulated by states, with one company responsible for producing and delivering power. These utilities had a legal obligation to serve all consumers and were forced to re-invest a portion of their profits back in to improving reliability. Were there flaws with this system? Of course. But it produced the most reliable and affordable power system the world had ever seen.
Enron and their ilk smashed it apart, replacing legal mandates with â??the marketâ? to regulate Americaâ??s power system. They assumed competition would successfully replace regulators to provide the necessary investments in power generation and transmission.
But that didnâ??t happen. With the requirements to invest a share of profits into improving reliability now removed, Wall Street and the power industry shunned putting their money into unprofitable investments like upgrading transmission lines and distribution networks. Why should investors spend money on low-rate-of-return investments like reliability when they can make a killing buying and selling power plants?
On top of this market failure, deregulation has also encouraged distributional utilities, like ConEd in New York, to skimp on preventative maintenance spending. They have slashed utility workforcesâ??particularly experienced, unionized jobs. And regulators in New York and other deregulated states no longer pour over the companiesâ?? reliability budgets, allowing the utilitiesâ?? service to slide in pursuit of higher profits. As a result, distributional utilities now have too much incentive to replace equipment after, not before, it blows.
Deregulation presents other challenges as well. The United Statesâ?? transmission system was designed to accommodate local electricity markets, not the large, freewheeling trading of electricity and movement of power over long distances under deregulation. Sending power over a much wider area strains a transmission system designed to serve local utilities.
Rather than require electric companies to return to their century-old obligation to re-invest in transmission, Congress and President Bush muscled through an energy bill last summer that jacks up power prices by allowing owners of transmission lines to charge higher prices. The energy bill sticks consumers with as much as $100 billion for the construction of new transmission lines that big energy companies want but consumers donâ??t need. This consumer-funded subsidy prioritizes the construction of power lines preferred by wire-hogging power marketers intent on moving large loads of electricity that will bypass the needs of local households.
Utilities are focusing more of their investments on things outside providing electricity service to customersâ??such as Enron-style power marketing, power plants far outside their retail service area, and ventures into broadband and the like. The result is a pattern where deregulation encourages billions of dollars to flow into non-utility ventures at the expense of shoring up reliability.
Rather than pandering to an electric industry that gave more than $47 million in campaign contributions to federal candidates since 2001 (with 66 percent of that total going to Republicans) Congress needs to restore reliability and affordability to our electric power system. Three steps to improving our system include:
- Providing incentives and assistance to states to help utilities re-acquire generation assets divested during deregulation;
- Promoting decentralized power sources such as distributed generation and wind and solar energy; and,
- Investing in energy efficiency technologies, such as building weatherization, to reduce electricity demand.
And states must insist on regulators that will be accountable to citizens, not utility company special interests. Ending the ability of regulators to cash in through the revolving door of getting a lucrative job after serving on public utility commissions would help restore accountability. And state and local governments can explore government-owned power, which provides lower-cost and more reliable service for millions of Americans across the country.
The recent blackouts were caused by a failure of policy. Ending the disastrous deregulation experiment and establishing locally-controlled power systems will help restore Americaâ??s electricity sector.
Tyson Slocum is the director of Public Citizenâ??s energy program.
© 2006 TomPaine.com
Notice Plan Comments for Transmission Due TODAY!
July 20th, 2006
.
Here comes 1,620 miles of bulk power transmission for export — the start of it is through Red Wing, going from “Brookings, SD” (though it starts way further out west) and going to LaCrosse (though it goes way further into WI than that, DUH!). Here’s a map:
(huh, used up my space??? how can that be?) will post later
Here’s a blog link with a map of the eastern part of this big line.
Here’s another blog link with ATC plan for big picture.
This is the start of too many miles of transmission projects through Minnesota, 1,620 miles and thousands of landowners affected. They don’t even list the PI paper for notice…
Notice Plan Comments are due today. Send to:
Burl Haar
Exec. Dir.
PUC
121 – 7th Place E.
St. Paul, MN 55101Fax: 651-297-7073
Notice Plan is available here:
http://www.capx2020.com/project_tc-roch-lac.html
Attached is my Comment on the western part of this line, and I’ll just be cut and pasting and making slight alterations for this. Dig the map of what they’re proposing for Prairie Island, and they leave the new subdivision in Red Wing off of the southern edge of the map. Funny how that works…
Here are CapX2020 links, and I’ve attached a pdf of the CapX2020 Vision Thang, but careful, you might lose your breakfast.
====================================
Project Group I
Project Group I includes approximately 600 miles of 345-kilovolt lines, connecting Minnesota with North Dakota, South Dakota and Wisconsin and a smaller 230-kilovolt line in the Bemidji area. These projects are estimated to cost approximately $1.3 billion.
| Year | Description |
2011 CapX Bemidji-North Central MN / 230 kV
2011 CapX Southeast Twin Cities-Rochester-La Crosse / 345kV
2012 CapX Brookings, S.D.-Southeast Twin Cities / 345 kV
2012 CapX Fargo-St. Cloud/Monticello Area / 345kV
Project Group II â?? Around the Twin Cities
Project Group II schedule to be announced
Project Group III â?? Remote Generation Outlet
Project Group III schedule to be announced
Transmission lines comin’ to town
July 15th, 2006
The transmission line passing, with the pipeline, through lower Scott & Dakota County, near Northfield, goes through Red Wing and then south to Wisconsin through LaCrosse.
Letter: Huge transmission lines coming to community
The Republican Eagle
Published Saturday, July 15, 2006
To the Editor:
Utility infrastructure investments are a 50-year energy policy commitment. Utilities are embarking on spending billions of our dollars on thousands of miles over thousands of property.
Is this necessary for reliability, adequacy of service or system security? No, this infrastructure is being built to facilitate unregulated export of bulk power for profit. What do we get out of it? Transmission lines in our yards.
There are three 345kV lines planned through our community. Two are now beginning the application process: Notice plans have been filed with the Public Utilities Commission. Because Minnesota law gives preference to existing corridors, the line is likely to parallel one on north side of Highway 61 atop the hill west of town, then to Prairie Island, taking a scenic meander through the reservation, back up and over the bluffs, through the Westwood subdivision toward Rochester.
I informed the Prairie Island Indian Community and theyâ??re paying attention, attending transmission planning meetings.
Whereâ??re Red Wing and Goodhue County? I informed the Realtors posting signs in Westwood, city planning, too; no one seemed concerned. The subdivision is an example of poor planning. Itâ??s bad enough theyâ??re allowed to build homes there, but whoâ??s telling residents whatâ??s in store?
These transmission proposals are nothing new. The Prairie Island to Wisconsin line was proposed as â??Line 3a/bâ? in 1998 and has been talked about for years. Transmission links are on my blog at http://www.legalectric.org in the â??Transmission for Dummiesâ? section. These specific lines are in the 2005 Transmission Plan, and public meetings were held last May. I didnâ??t see any city or county representatives there, and I know they were provided notice because the stateâ??s Transmission Plan rules require it.
Will county and city land-use professionals start attending the state meetings so they know whatâ??s in store and wonâ??t be surprised again? Will developers, landowners and land-use officials pay attention to canons of appropriate land-use? Will local governments submit comments about the Notice Plan and participate effectively in the Certificate of Need docket? Will our elected officials represent us?
Carol A. Overland
Red Wing
Carol Overland is running for City Council member at-large.
Transmission is coming to Red Wing
July 10th, 2006
Yes, it’s here. Yes, transmission is coming, three lines in the Red Wing area, and here are the first two:
1) SW Minnesota to “Hampton Corner” or Prairie Island
The first is the one from SW Minnesota to “southeastern Twin Cities,” and the Notice Plan has been filed.
To find info on this, go to the PUC site, www.puc.state.mn.us, and click on eDockets and enter the docket number “06-857.”
Notice Plan Comments were probably due at the end of the month, but you can send Reply Comments, QUICK, NOW, to:
Dr. Burl Haar burl.haar@state.mn.us
PUC, 121 E 7th St., Suite 350, St. Paul, MN 55101-2147
2) “Twin Cities” to Rochester to LaCrosse
The second one affecting the Red Wing Area was called “Prairie Island to Rochester to LaCrosse” and now it’s called “Twin Cities” to Rochester to LaCrosse. We’ll see what that means, and from the maps, it’s anybody’s guess.
There’s no PUC docket number. What I received was the Notice Plan, and comments are due at the PUC by 4:30 p.m. on July 21, 2006.
To get copy of Notice Plan and a lot of cute but confusing maps (aren’t transmission lines all connected??? Very strange) and one that has the 345kV line going right through the Prairie Island Administration Building. Right, good plan there… and that map has TWO lines doing a scenic tour of the reservation. Why???
Anyway, to get a copy of the Notice Plan call Xcel, Mary Martinka (612) 330-6737.
I checked Xcel’s Transmission site and neither of these are listed.
3) Chisago Project
Just for yucks, here’s the other one I got in the mail, the Chisago Project is being revived. Don’t they get it’s brain dead? ME3 used to have the archives, but that’s all gone now… sob… and that Chisago substation is connected to the third one coming to Red Wing, the Chisago-Red Rock-Prairie Island line.
Have we had enough of transmission for today?
Pipeline and Transmission share corridor – N of Northfield
June 17th, 2006

Pipeline Route in Scott County

Eastern half of Transmission Line – Scott & Dakota County

Pipeline Route in Dakota County
Earth to Mars, is anyone paying attention? Ray Cox posted both on the same blog and didn’t even notice…
Look at these maps, folks! Wake up!
And why isn’t there anything on this in the Northfield News?
…zzzzzzzzzzz … everyone’s sleeping at the switch again…