hiawathaprojectplusmap-3

The Hiawatha Project, Xcel’s transmission line vision/nightmare for Phillips Community in South Minneapolis, is getting closer, moving forward toward an application.

CLICK HERE for the MOES Docket Page for Hiawatha Project

Go to that page and sign up for notices and info if you haven’t already!

Here’s what just came over the wire from RaeLynn S. Asah, Xcel:

Greetings!

You have been previously contacted regarding the Hiawatha project and have expressed interest in keeping up to date on the status of the project.

We are currently finalizing the Route Permit application for the Hiawatha project and plan to file later this month.

As we have been preparing the application, we have been including input from the community on concerns about the project:

* The application will include four possible transmission line route locations and five design options, including the two underground route options that have been discussed (along 28th Street and 29th Street).
* We are including alternative locations for both the Midtown and the Hiawatha substations.
* We are including copies of the various resolutions in the application that reflect the concerns raised by various entities in the area.

As part of the filing requirements, various City and County staff and representatives receive copies of the application along with copies at the local library. The filing will also be available on the Minnesota Public Utilities Commissions (PUC) web site (Docket # E002/TL-0938) and on our website. However, given your past involvement, we expect you would may a copy of the application.  We would prefer to limit the number of paper copies we print to those that prefer that type of document.  We will also provide a CD version to those who prefer that option.

Xcel Energy is committed to working with the community to the extent possible and fully encourages everyone to become involved in the Minnesota Public Utilities Commission (PUC) process, which is open to all interested parties and individuals.  The best way to ensure your organization and constituents stay apprised of project developments is to register with the PUC to be on their mailing list.  You can do this by calling the PUC directly as requesting to be included on the mailing list for project docket #E002/TL-0938.

Please contact me as soon as possible to let me know if you would like a copy of the application, the type of document (paper or CD) and the number of copies.

Please feel free to contact me directly, all of my contact information is listed below.

RaeLynn S. Asah |  Permitting Analyst  |  Siting and Land Rights  |  Transmission, Flr 8  |  Xcel Energy  |  250 Marquette Ave  |  Minneapolis MN 55401  |  o:  612-330-6512  |  fax: 612-573-4011

Leave a Reply