West Avenue, almost done, and parking changes?
October 30th, 2014
That’s tonight! West is almost done. The final layer of asphalt is now down, and they’ve dumped black dirt behind the wall and sprayed the boulevards and dirt bordering the sidewalks with that green stuff.
Here’s the new yard, with two new trees (with aftermarket bird nest), and the wired-for-light post for the Little Free Library next to the Neighbors Against the Burner sign:
Leave a Reply