Hiawatha Project Comments due tomorrow
October 25th, 2011
(above – Overland’s take on what’s really happening here, that Hiawatha is “B to C” of a much larger project, one that’s been in progress for years, check the upgrades at that 280 and East Hennepin substation, and at the Wilson sub at 494 and Nicollet, if you want some concrete and steel proof)
Comments are due tomorrow by 4:30 on Xcel Energy’s Hiawatha Project. Send to:
Beverly Jones Heydinger, ALJ
Office of Administrative Hearings
P.O. Box 64620
St. Paul, MN 55164-0620
or email:
beverly.heydinger@state.mn.us
Some documents you might want to check out are:
For an even better showing of substations and which serve what area, where you can see that the Southtown Sub stretches to the southwest beyond the study zone, and that Aldrich serves a significant part of the study zone, and St. Louis Park a little bit. Check the Application, Appendix A, p. 24 of 102 (click for larger version):
And be sure to take a look at the Zima Schedule 2 and 3, I particularly like Sched. 3, that shows that there is a lot of wiggle room there for the transformers, look at Aldrich, even Elliot Park with the smaller transformers. Here’s Schedule 3 — click for a larger view.
Here are the exhibits that I entered at the public hearing:
10-694 – Ex. 27 – South Mpls Electric Reliability Study
10-694 – Ex. 28 – South Mpls Electric Distribution Delivery System Plan
10-694 Ex. 29 – pages from 2007 Transmission Plan
10-694 Ex 30-MAPP NM-SPG Meeting Minutes 7/24/2008
10-694 Ex 31 From SW MN 345kv Application, Appendix 7 Conductor Specs
Two things to check out to compare with their “forecasting” for this project:
Leave a Reply