hiawathaprojectplusmap-3(above – Overland’s take on what’s really happening here, that Hiawatha is “B to C” of a much larger project, one that’s been in progress for years, check the upgrades at that 280 and East Hennepin substation, and at the Wilson sub at 494 and Nicollet, if you want some concrete and steel proof)

Comments are due tomorrow by 4:30 on Xcel Energy’s Hiawatha Project.  Send to:

Beverly Jones Heydinger, ALJ

Office of Administrative Hearings

P.O. Box 64620

St. Paul, MN  55164-0620

or email:

beverly.heydinger@state.mn.us

Some documents you might want to check out are:

Xcel’s filing today – Substation location maps

For an even better showing of substations and which serve what area, where you can see that the Southtown Sub stretches to the southwest beyond the study zone, and that Aldrich serves a significant part of the study zone, and St. Louis Park a little bit.  Check the Application, Appendix A, p. 24 of 102 (click for larger version):

appa1-p24of104

And be sure to take a look at the Zima Schedule 2 and 3, I particularly like Sched. 3, that shows that there is a lot of wiggle room there for the transformers, look at Aldrich, even Elliot Park with the smaller transformers.  Here’s Schedule 3 — click for a larger view.

greaterareasubstationxfmrloadhistoryforecast

Here are the exhibits that I entered at the public hearing:

10-694 – Ex. 27 – South Mpls Electric Reliability Study

10-694 – Ex. 28 – South Mpls Electric Distribution Delivery System Plan

10-694 Ex. 29 – pages from 2007 Transmission Plan

10-694 Ex 30-MAPP NM-SPG Meeting Minutes 7/24/2008

10-694 Ex 31 From SW MN 345kv Application, Appendix 7 Conductor Specs

Two things to check out to compare with their “forecasting” for this project:

MISO’s Futures Matrix for MTEP 12

MISO Peak Forecasting Metholodogy Review Whitepaper 2011