maidenrocksand_stribPhoto of Maiden Rock frac sand mining operation across the river

The MPCA has announced a frac sand mining air permit comment period for the mine proposed in Scott County near Shakopee.

I believe this is the first frac sand mining permit to go through MPCA air permitting (I’ll check). Here’s the MPCA’s Frac Sand Mining Page.

If you write comments, there are specific things that have to be included, it says “must” in the Notice and “shall” in the rules, so I think they mean it.  Here’s what the rules say about comments:

Subp. 2. Contents of written comments.

A person who submits comments under subpart 1 shall include in the comments the following:

C. the reasons supporting the person’s position, stated with sufficient specificity as to allow the commissioner to investigate the merits of the person’s positions.

You may request a contested case, and that must be done under Minn. R. 7000.1800 Petition for Contested Case.  If you plan to do that, also check out Minn. R. 7000.1900 Criteria to Hold Contested Case Hearing.

Send Comments and Petitions by August 27, 2012 to the MPCA:

Steve Gorg, Air Quality Permits Section

Industrial Division, MPCA

520 LaFayette Road North

St. Paul, MN  55155

steven.gorg@state.mn.us

Here are the primary documents from the MPCA site:

  • Document Intent to Issue Air Emission Permit to Great Plains Sand LLC, Shakopee – Notice Full Text
  • Document Draft Air Emission Permit
  • Document Technical Support Document
  • mesaba-netl-generic-gasifier.jpg

    Excelsior Energy’s Mesaba Project, the coal gasification plant that will not die, is returning to the Minnesota Public Utilities Commission on August 14, 2012.

    Notice – August 14, 2012 PUC Meeting

    At that time, they’ll address whether the original project’s permits apply to this project, and whether this one, under Minn. Stat. 216B. 1694, requires additional environmental review:

    **6.     E6472/GS-06-668 Excelsior Energy, Inc.
    In the Matter of the Joint LEPGP Site Permit, HVTL Route Permit and Pipeline (Partial
    Exemption) Route Permit Application for the Mesaba Energy Project in Itasca County.
    Should the Commission find, pursuant to Minnesota Statutes 216B. 1694 subdivision 3, that the
    site and route permits issued on March 12, 2010 for the Mesaba Energy Project are deemed valid
    for a natural gas fired plant located at the same site and that no additional environmental review
    is required under applicable state rules?

    This docket has been one of the longest strangest trips ever, a coal gasification plant that wasn’t needed yet fed by state and federal money, using CO2 capture and storage that does not, can not, and will not exist.  Here’s some history:

    Health Benefits of Coal (ya gotta read this one, HILARIOUS!)

    Mesaba – Extend the Hearing! (the hearing was a farce)

    And why are we here on the 14th?  The PUC granted a Site Permit to the project f/k/a Mesaba Project, the coal gasification plant:

    ALJ Recommendation – Mesaba Site Permit

    PUC Order and Site Permit – March 2010

    Then it starts getting complicated, Excelsior sends PUC letter saying it wants confirmation that the permits issued for the Mesaba Project coal gasification plant are valid for a natural gas plant, and that it would require no further environmental review:

    Excelsior Energy Request – May 31, 2012

    Notice of Comment Period

    Comment – mncoalgasplant.com

    Commerce CommentsSierra Club Comment

    And then Excelsior chimes again disclosing not much of anything about their “plan” for this gas plant:

    Excelsior’s Response to Commerce IRs June 26, 2012

    And then the Comment period is extended and we get another bite:

    MCGP Reply Comment

    And now we’re off to the races…

    In the Duluth News Tribune:

    Feds say no more money for Iron Range Excelsior Power Plant

    horsesasses.jpg

    AAAAAAAAAAAAAAAAAGH!

    July 30th, 2012

    Communications problems.

    New computer, major hassles with getting set up…

    Cannot post on Legalectric or NoCapX!  Got that figured out on the “baby” but still not on the new machine.   grrrrrrrrrrrrrrrrrrrrr…

    Then major MAJOR problems with email, cannot send, cannot get through to Charter to fix it… days on end…  GRRRRRRRRRRRRR!

    THEN, NO EMAIL AT ALL!

    THEN NO PHONE!!

    NO SIGNAL!!!

    WTF!!!!

    I’m sorry folks, but I cannot operate using FB for business!!!  Xcel, what are you up to???

    lion-roaring-african-lion

    oahofficestassen-building

    OAH Rulemaking Request for Comments

    OAH Rulemaking Draft Changes

    Well, folks, here we go, just got notice TODAY from Judge Lipman of the rulemaking at Office Administrative Hearings. Send Comments to:

    Honorable Eric L. Lipman, Assistant Chief ALJ

    P.O. Box 64620

    St. Paul, Minnesota   55164-0620,

    Electronic Mail: eric.lipman@state.mn.us

    Here’s the “purpose” according to OAH (listed in numbers, not letters):

    The purpose of these draft revisions to Parts 1400 and 1405 is to:

    1. streamline hearing procedures across different types of administrative proceedings;
    2. leverage the broader familiarity with contested case procedures to improve predictability in the hearing process for other types of cases;
    3. better reflect contemporary hearing practice and the technological changes occurring since September of 2001 (when the last revision of OAH’s procedural rules was completed); and
    4. improve predictability in the hearing process by more closely aligning OAH’s procedures with the General Rules of Practice of the District Courts.

    I have a vested interest in this because I’d filed a Rulemaking Petition ages ago:

    Overland – Petition for Rulemaking – OAH

    That was March, 2011, IT TOOK A YEAR AND A HALF!

    Here are a few things I hope you’ll look at — the parts cited with a page number are from the OAH Rulemaking Draft Changes:

    • Draft Changes, p. 2, definitions of Participant and Person – narrowing definition of person:

    As proposed, on p. 4:

    20   Subp. 6a. Participant. “Participant” means a nonparty who:
    21
    22  A. files comments or makes a formal appearance in a
    23   proceeding authorized by the Minnesota Public Utilities
    24   Commission, other than those commission proceedings that
    25   are conducted to receive general public comments; or,
    26
    27   B. with the approval of judge, offers testimony or
    28   evidence pursuant to part 1400.7150 or 1400.8605.

    37  Subp. 8. Person. “Person” means any individual, business,
    38   nonprofit association or society, or governmental entity.

    As found in the PUC’s Rules, Minn. R. 7829.0100, Subp. 13 and 15:

    Another in a trend of limiting participation by the public, QUESTIONING WITNESSES IS OUT – SAY WHAT????  See Draft Changes, p. 14-15 (see also p. 59-60):

    45   Subp. 5. Participation by public. The judge may, in the
    46  absence of a petition to intervene, nevertheless hear the

    1    testimony and receive exhibits from any person at the
    2    hearing, or allow a person to note that person’s appearance,
    3    or allow a person to question witnesses, but no person shall
    4    become, or be deemed to have become, a party by reason
    5     of such participation.
    Persons offering testimony or exhibits
    6    may be questioned by parties to the proceeding.

    Where then PUC’s rules provide for much more — check out current Minn. R. 1405.0800, which they want to just ELIMINATE!  It starts here:

    7829.0900 PARTICIPANT.

    A person may file comments in a proceeding before the commission without requesting or obtaining party status. A participant may also be granted an opportunity for oral presentations.

    Here’s one of the really limiting changes that is NOT OK:

    20 1405.0800 PUBLIC PARTICIPATION.
    21
    22 At all public hearings conducted in proceedings pursuant to
    23 an order of the Commission parts 1405.0200 to 1405.2800,
    24 all persons will be allowed and encouraged to participate
    25 without the necessity of intervening as parties. Such
    26 participation shall include, but not be limited to:
    27
    28 A. offering testimony or other material at the public
    29 hearing;
    30
    31 B. questioning any agency official or agent of an
    32 applicant who participates in the public hearing; or,
    33
    34 C. offering testimony or other material within the
    35 designated comment period.
    36
    37 A Offering direct testimony with or without benefit of oath or
    38 affirmation and without the necessity of prefiling as required
    39 by part 1405.1900.
    40
    41 B. O offering direct testimony or other material in written
    42 form at the public hearing or within the designated comment
    43 period following the hearing. However, testimony which is
    44 offered without benefit of oath or affirmation, or written
    45 testimony which is not subject to cross-examination, shall be

    given such weight as the administrative law judge deems
    2 appropriate.
    3
    4 C. Questioning all persons testifying. Any person who
    5 wishes to cross-examine a witness but who does not want to
    6 ask questions orally, may submit questions in writing to the
    7 administrative law judge, who will then ask the questions of
    8 the witness. Questions may be submitted before or during
    9 the hearings.

    Comments are due by 4:30 p.m. on Wednesday, October 31, 2012.  Guess they’re in no hurry here!

    From the notice:

    Written comments, questions, requests to receive a draft of the rules, and requests for more information on these possible rules should be directed to: Honorable Eric L. Lipman, Assistant Chief Administrative Law Judge, P.O. Box 64620, St. Paul, Minnesota, 55164-0620, Telephone: (651) 361-7900, Facsimile: (651) 361-7936, Electronic Mail: eric.lipman@state.mn.us; TTD users may call the OAH at (651) 361-7878.

    Another odd thing from the notice, as this is a PRE-Rulemaking Comment Period:

    NOTE: Comments received in response to this notice will not necessarily be
    included in the formal rulemaking record if and when a proceeding to adopt rules is
    started. The agency is required to submit for review only those written comments received in response to the rules after they are formally proposed. If you submitted comments during the development of the rules, and you want to ensure that those same comments are part of the later review, you should resubmit the comments after the rules are formally proposed.

    Citizens League has an “Electrical Energy” project sponsored by none other than Great River Energy, Xcel Energy, District Energy and University of Minnesota Energy Management:

    CITIZENS LEAGUE ELECTRICAL ENERGY PAGE

    So what is Citizens League doing “to develop and advance policy recommendations?” What are the sponsors after?   Looking at their report, it seems the focus is on advancement of utility desires for utility benefit and profit, and given the assumptions in this report, I don’t want to see ANY 0olicy recommendations come out of it.

    Here’s the report:

    Electrical Energy Project, Phase I Working Document: Defining the Outcomes of Minnesota’s Ideal Electrical Energy System

    They’ve hosted several meetings across the state so far and there are more to come:

    Worksite June 5, 2012

    Minneapolis June 21, 2012

    St Paul June 26, 2012

    Morris July 9, 2012

    Upcoming Meetings (click date/location link for their page for that meeting):

    July 24 — Rochester
    5:30-7:00 p.m.
    University Center Rochester
    Main campus building, room CF206/208 in Coffman
    851 30th Ave SE, Rochester (building map)

    July 25 — Maple Grove
    6:00-7:30 p.m.
    Great River Energy
    12300 Elm Creek Blvd N, Maple Grove 55369

    July 31 — St. Paul
    5:30-7:30 p.m.
    Rondo Community Outreach Library, Multi-Purpose Room
    461 N Dale Street, St. Paul

    So what’s the problem?  In large part, it’s how they’re framing the problem!

    • It starts off with a sense of urgency — “We must start now, before crises arise.”  “Now is the time to act.”  “We must confront these issues now, before they reach a crisis point.”  “This is the time to ask:…”  But it’s years too late,   In 2002 the wheels were set in motion to put us where we are today with the enviros deal to support CapX 2020 and other transmission, and then their support of the 2005 Transmission bill:

    Settlement Agreement – ME3(Fresh Energy), Izaak Walton League, Minnesota Center for Environmental Advocacy, North American Water Office

    $8.1 Million Wind on Wires grant from McKnight/Energy Foundation

    MCEA CapX Fact Sheet

    2005 Ch 97 – Xcel transmission perks and C-BED

    After all this, it’s waaaaaaay too late!  With CapX 2020, we’re now committed to 50+ years of central station business-as-usual power.  It’s too late to create a “vision.”

    • Report operates on false and outdated presumptions of need – of demand for electricity, of infrastructure needs and reliability.  Claims “we cannot assume we’ll use electricity in the same way in 30 years as we do today,” but with CapX we’ve just locked in to another4 50 years of central station power.   Xcel itself admits dramatically reduced demand, both peak and energy demand, significantly to alter forecasts to 0.5% and 0.7% respectively:

    Xcel’s Resource Plan Update – Dec 2011

    Look at the reserve margins (p. 46, et seq.) in the NERC 2011 Long Term Reliability Assessment!

    • They talk a lot about retail rates, and that “the price of electricity has been rising over past decades; however, this increase has not kept up with inflation.”  This is a REGULATED industry!  Rates have kept up with utility costs, and I guess it’s a safe bet that retail rates have NOT dropped in relation to the crash in wholesale costs.  Wholesale rates are so low, and have been for so long, that they probably owe us one massive refund!  So what is this section supposed to mean?  (see p. 8-10).
    • Green House Gas emissions are way down, they state that it is due to a “reduced reliance on coal.”  How about impact of decreased demand for electricity, decreased burning of coal, focused on lower need, not “reduced reliance.”  There’s a difference!  Xcel’s Sherco is down, has been for what, a year now?  Xcel’s Black Dog is down, Minnesota coal plants are not running and it has nothing to do with a choice in fuel, but more to do with unplanned explosions at the generators at a time when that capacity is not needed!  At least we presume the explosions are unplanned.
    • Claims of inefficiency belie the reliance on transmission and CapX 2020 and other commitments to continued use of transmission that is inherently inefficient, and to plan to use it even more inefficiently in transferring bulk power over long distances.  “It would be inefficient to invest heavily in infrastructure with a life cycle of 100 years, for example, if a key resource supporting that system is expected to become rare or expensive in 20years.”  Well DUH, but that’s exactly what we’ve done, what we’re doing, with CapX.  Anyone making noises about efficiency has no business promoting transmission!  And yet look at the plans promoting transmission across the country!

    jcsp08-xmsndream

    No way do they want our transmission out to the Mid-Atlantic:

    East Coast Governors STAND UP AGAIN!

    • Throughout, this report does not distinguish between transmission and distribution issues, but it should!  Particularly in discussing outages, and even in the discussion of “back-up generators for business” where reliability does NOT presume back-up generators as redundancy!
    • Pay attention to the order of “Key Characteristics of the Electrical System”  — RELIABILITY is not first!  It’s about money!
    • Appears to advocate for perpetual motion in stating “A system that cannot continue indefinitely without bankrupting the participating people or institutions cannot be sustained.”  Very odd concept of economic viability.  Energy systems will always require more input that what is received as output.

    As I look at this report, and its trajectory, it seems like a prelude to a dis!  Perhaps increased rates for lower MWhr sales, or perhaps even claiming unused and unneeded coal plants as stranded costs!