NOW – Comments on Xcel’s garbage burner air permit
February 7th, 2026
The Minnesota Pollution Control Agency (MPCA) has announced a comment period on the draft air permit for the Xcel Energy garbage burner here in Red Wing. The air permit expired back in 2009… yes, really… and it’s been operating without one, which is allowed because they did submit an application, and it’s been sitting there dormant, forever.
COMMENT FORM FOR XCEL’S GARBAGE BURNER LINKED HERE!
But what to comment about?
Background info:
This has been going on a LONG time:
MPCA on Xcel’s Red Wing garbage burner – February 12, 2024
MPCA on Air Permits at Red Wing Library Last Night – April 9, 2024
And it was up for comment previously:
Red Wing garbage burner permit up for comment – June 24, 2024
And this comment was really weird — “our” sheriff advocating for burning garbage at Xcel Energy’s garbage burner in Red Wing, and also in Wilmarth and La Crosse? What could possibly be the basis for that? Hmmmmm…
Sheriff Kelly on garbage burning? – December 16, 2024
Here’s an opinion piece by Alan Muller on Red Wing and garbage:
Viewpoint: Truth re-evaluation of incineration long overdue
In any case, Red Wing has tried ever since to get others to subsidize its poor judgment. For example, in 2006 Red Wing passed an ordinance requiring all the garbage collected in Red Wing to be hauled to the incinerator. This caused the intervention of the Institute for Justice, which noted: “The City of Red Wing, Minn., has unconstitutionally turned its local government into a special interest protected from competition.” https://ij.org/case/pauls-industrial-garage-and-gibson-sanitation-v-city… The city lost in federal court, but in 2007 a U.S. Supreme Court decision shifted the law somewhat in favor of Red Wing’s position. https://www.supremecourt.gov/opinions/06pdf/05-1345.pdf
It’s long past time for people to wake up and assert themselves.


Leave a Reply