How to work up excitement about the Certificate of Need rulemaking???  On its own, it’s dry, detailed, wonkish stuff, thrilling only to those of us who live and breathe need decisions and utility infrastructure siting and routing… but may there’s some pizazz in the machinations surrounding input, like lack of public representation on the Advisory Committee such that even my tremendous bulk doesn’t even it out.  Does Xcel deserve THREE representatives? ITC two?  “Participating Utilities” two, “Wind Coalition” one and none for Goodhue Wind Truth?  Here’s the list:

Advisory Committee Contact List

Plus they’re not posting the drafts on the rulemaking site, so the public has no idea what’s being proposed:

7849 June 5 DRAFT New

And minutes from the first meeting:

Synopsis – May 29 meeting

To get to the docket, go to www.puc.state.mn.us and then “search eDockets” and search for 12-1246.

We’ll be talking about the Certificate of Need criteria next, and here’s what’s proposed:

7849.0120 CRITERIA CERTIFICATE OF NEED REQUIREMENTS.

   A certificate of need must be granted to the applicant on determining that:

  Subpart 1. Need Demonstration. An applicant for a certificate of need must demonstrate that the demand for electricity cannot be met more cost effectively through energy conservation and load-management measures.

Subpart 2. Renewable Resource Preferred. An applicant proposing an LEGF that uses a nonrenewable energy source must demonstrate that it has considered the use of renewable energy sources, as required under Minnesota Statutes section 216B.243, subd. 3a.

Subpart 3. Assessment of Need Criteria. In evaluating a certificate of need application, the

commission shall consider the criteria contained in Minnesota Statutes, section 216B.243, subd. 3, as well as the following:

     A.  whether the probable result of denial would be an adverse effect upon the future adequacy, reliability, or efficiency of energy supply to the applicant, to the applicant’s customers, or to the people of Minnesota and neighboring states, considering: the region;

                (1)  the accuracy of the applicant’s forecast of demand for the type of energy that would be supplied by the proposed facility;

                  (2) the effects of the applicant’s existing or expected conservation programs and state and federal conservation programs;

      (3)  the effects of promotional practices of the applicant that may have given rise to the

increase in the energy demand, particularly promotional practices which have occurred since 1974;

      (4) B. the ability of current facilities and planned facilities not requiring certificates of need to meet the future demand; and

      (5)  the effect of the proposed facility, or a suitable modification thereof, in making efficient use of resources;

             B C.  whether a more reasonable and prudent alternative to the proposed facility has not been demonstrated by a preponderance of the evidence on the record, considering:;

                (1)  D. the appropriateness of the size, the type, and the timing of the proposed facility compared to those of reasonable alternatives;

      (2) E. the cost of the proposed facility and the cost of energy to be supplied by the proposed facility compared to the costs of reasonable alternatives and the cost of energy that would be supplied by reasonable alternatives;

              (3) F. the effects of the proposed facility upon the natural and socioeconomic environments compared to the effects of reasonable alternatives; and

                (4) G.  the expected reliability of the proposed facility compared to the expected reliability of reasonable alternatives;

             C.   by a preponderance of the evidence on the record, the proposed facility, or a suitable modification of the facility, will provide benefits to society in a manner compatible with protecting the natural and socioeconomic environments, including human health, considering:

                (1) the relationship of the proposed facility, or a suitable modification thereof, to overall state energy needs;

      (2) H. the effects of the proposed facility, or a suitable modification thereof, upon the natural and socioeconomic environments compared to the effects of not building the facility;

                (3) I.  the effects of the proposed facility, or a suitable modification thereof, in inducing future development; and

                (4) J. the socially beneficial uses of the output of the proposed facility, or a suitable modification thereof, including its uses to protect or enhance environmental quality; and.

             D.   the record does not demonstrate that the design, construction, or operation of the proposed facility, or a suitable modification of the facility, will fail to comply with relevant policies, rules, and regulations of other state and federal agencies and local governments.