Why? Wisconsin has a “brownfield” bill, but Public Service Commissioners IGNORE the requirement that energy infrastructure be built on brownfields:

Wis. Stat. ยง196.491(3)(d)8:

(d) Except as provided under par. (e), the commission shall approve an application filed under par. (a) 1. for a certificate of public convenience and necessity only if the commission determines all of the following:

8. For a large electric generating facility, brownfields, as defined in s. 238.13 (1) (a), are used to the extent practicable.

Despite this clear requirement, they acknowledge it, laugh about it, and dismiss it without consideration, and instead site on prime and protected agricultural land.

So YES! This, something I’ve been advocating for, for YEARS!

And eagle that had been feeding on that possum in the foreground, and it flew up as I approached on 110th St. in rural Freeborn County,

A wind energy company has pleaded guilty after killing at least 150 eagles

What’s really odd about this is that most of the projects that I’ve been dealing with in permitting have secured eagle take permits — I thought. In this case, NextEra seems as a policy not to have take permits. HUH?

I am remembering resistance to developers answering questions about eagle take permits, and I think that it comes down to whether USFWS requires them to get one.

Here’s USFWS info on eagle permits here in the Midwest – it appears that there are only three eagle take permits issued for Minnesota wind projects, Red Pine, Getty/Black Oak, and Pleasant Valley/Grand Meadow:

Midwest Region- NEPA Documents for Eagle Permits

This seems to say that there are only FIVE eagle take permits? Here’s the application for one project that I’d worked on:

Black Oak/Getty Wind Farm Eagle Take Permit Application

For the Freeborn Wind project, we entered information about locations of nests and photos of eagles foraging, nests and foraging territory being, supposedly, two criteria examined in siting of wind projects and consideration of need for take permits:

See Freeborn Wind ALJ Recommendation, and search for “eagle” in the Recommendation.

Methinks this will have significant impact, but sentencing a company to probation — but how does that work?

This is just too weird:

Capitol riot suspect is granted refugee status in Belarus after fleeing US

Evan Neumann: US Capitol riot suspect gets asylum in Belarus

Parking it here for future reference.

Here it is:

PJM 2021 State of the Market Report

Note that where NERC does not project a significant decrease in coal production, PJM’s coal generation increased from 2020 to 2021 (now we do need to keep in mind that 2020 was a very low demand year):

From PJM State of the Market, p. 21

Here’s an overall summary:

The big takeaway is that demand has increased over 2020, which is no surprise. Note the “Average Hourly Load” and “Average Hourly Generation” and compare with “Installed Capacity.” Capacity is essentially twice Average Hourly Load and Average Hourly generation (and note exports and imports are included).

And just for shits and giggles, here’s the PJM LOCATIONAL MARGINAL PRICING MAP!

And here’s MISO’s too:

MISO LMP Map

What it looks like right now in MISO: