TRANSMISSION – something to ponder
June 22nd, 2005
This stuff is technical, and takes some time. So while I’m slaving away, scanning documents, think about this.
The claim is that we “need” 6,000MW of generation (p. 4) in the area and we don’t have it AND WE’RE GOING TO BROIL WITHOUT AIR-CONDITIONING IN THE DARK IN AN INCUBATOR WITHOUT A JOB!
Meanwhile, the MISO queue shows 16,712 of generation planned in the same area (p. 7), an admittedly conservative estimate. For a better quality version, click link above and look it up!
Do the math! Let’s see… 16,712 new – 6,000 “needed” = ??????????