20161006_0934531

It was a long, long day. Bottom line? Based on the record, and based on acknowledgement of Xcel’s peak demand history, we can shut down Sherco 1 & 2 now without missing it, and by 2025 or so, shut down Prairie Island and not have to pay for significant rehab to keep it running.

Here is the PUC webcast:

 

Here is my handout, noting the 700-788MW overstatement of peak demand forecast.

Legalectric_Handout_IRP

peakdemand_2002-2016

If you start with Xcel’s 2015 actual peak demand, and extrapolate using the 0.3% annual increase out to 2030, here’s what it looks like (click for larger view):
forecast_adjusted

These are the charts that they’re using, starting with inflated forecasts of 9,409 and 9,442MW for 2016, note how far off the resulting 2030 “forecast” is — it’s 800 – 1,234 MW off!
staffp12

With the “forecast” that much off, it’s as absurd as the CapX 2020 2.49% annual increase. Staff questioned the forecasts in the Briefing Papers, Commissioner Lange raised forecasts right off the bat, and Commissioner Schuerger claimed it was at least 300 MW off (don’t know where that 300 MW came from). These discrepancies havce been noted, and they should dig deeper, because the numbers used by Xcel do not add up. Were they lying in the SEC filings or are they lying now? Why isn’t Commerce challenging this, given admissions of the existing surplus? This forecast overstatement, plus admission of under-utilization of grid (meaning grid has been overbuilt, DOH, CapX 2020 and MVP projects are not “needed” in any sense) raises a few issues:

1) This misrepresentation is NOW equivalent to at least one coal plant, and by the end of 2030, or by the time presumed for shut down of Sherco 1 and 2, it’s much more than that.

2) This misrepresentation avoids consideration of shut down of Sherco 1 & 2 NOW, and shutdown of Prairie Island at the 2024-2026 time frame, and avoidance of $600-900 million in capital costs, or more, for Prairie Island.

3) This misrepresentation circumvents discussion of the admitted surplus now existing, even Dr. Rakow admitted to that at least twice in Thursday’s discussion. Where there is surplus, they can sell it elsewhere, and that is, after all, the purpose of CapX 2020 and MVP transmission.

Got that? We can shut down Sherco 1 & 2 now without missing it, and by 2025 or so, shut down Prairie Island and not have to pay for significant rehab to keep it running. This is not rocket science. It’s as simple as using actual peak demand as a starting point and not making up numbers as they have been doing.